We were present at the instrumentation works of Line 4 of the Rio Metro, which is part of the RIO 2016 Olympics Mobility Works Package.With a team of approximately 120 people, we performed the daily readings of the most diverse equipment installed, among buildings rebounding pins, superficial repression marks,...
Saiba maisWe are the only company contracted by the consortium responsible for building the largest Metro Line in recent years in Brazil. The Line 6 (Orange) is approximately 15.3 kilometers long, which was excavated with TBM / EPB. It will pass through major shopping centers and regions where important educational...
Saiba maisWe participated in the instrumentation of the UASD – Corredor Duarte tunnel, through a contract with Construtora Odebrecht. The road tunnel has approximately 900 meters of extension, where the internal readings of convergence and repression, as well as mass instrumentations (tassometers and surface landmarks) and the buildings close to...
Saiba maisWe elaborated the conceptual design of the Santorini Terminal, which has an area of approximately 1.2 million square meters, including cellulose terminals, liquids, solid bulkheads, parking space and four mooring berths in the Port of Santos. The designed conveyors that will go to the wharf are of the enclosed...
Saiba maisWe developed the complete basic design of the civil, mechanical, electrical and automation disciplines of the Miritituba Terminal, of Hidrovias do Brasil. We also provide support for the hiring and equalization of technical proposals from suppliers of the Miritituba Cargo Transhipment Station located on the banks of the Tapajós...
Saiba maisWe were responsible for the basic and executive project of the containment and sediment accumulation dam, coming from the Risoleta Neves HPP reservoir, in the city of Rio Doce, in the state of Minas Gerais. This project comprises a mass of compacted soil and a free-spillway spillway. In the...
Saiba maisBTP (Brazil Terminal Port) is a multipurpose terminal for the handling of containers and liquid bulk, located in the Port of Santos in a projected area of 490 thousand m² and a dock of 1,108 meters. In this project, we work from its conception until delivery, with basic project...
Saiba maisThrough a contract with CODESP (Companhia Docas do Estado de São Paulo), we are working on the management and supervision of the alignment work of the Cais da Copa, also known as Cais de Outerinhos, located in the Port of Santos. The wharf has a total length of 1,283...
Saiba maisOur team was contracted by Vale to integrate all the On-shore and Off-Shore Executive Projects of TIPLAM – Port Integrator Terminal Luiz Antonio Mesquita, currently operated by VLI. In addition, we participate in the Executive Planning for the implementation of the works and we also act as ATO (technical...
Saiba mais