+55 (11) 3019.2850

All posts by Latina18@

  • Por : Latina18@
  • instrumentation
  • Comments Off on Instrumentation of Mobility Works of the Rio 2016 Olympics

Instrumentation of Mobility Works of the Rio 2016 Olympics

We were present at the instrumentation works of Line 4 of the Rio Metro, which is part of the RIO 2016 Olympics Mobility Works Package.With a team of approximately 120 people, we performed the daily readings of the most diverse equipment installed, among buildings rebounding pins, superficial repression marks,...

Saiba mais
  • Por : Latina18@
  • instrumentation
  • Comments Off on LPC Latina in Line 6 Orange of Metrô SP

LPC Latina in Line 6 Orange of Metrô SP

We are the only company contracted by the consortium responsible for building the largest Metro Line in recent years in Brazil. The Line 6 (Orange) is approximately 15.3 kilometers long, which was excavated with TBM / EPB. It will pass through major shopping centers and regions where important educational...

Saiba mais
  • Por : Latina18@
  • instrumentation
  • Comments Off on Instrumentation in Santo Domingo, Dominican Republic

Instrumentation in Santo Domingo, Dominican Republic

We participated in the instrumentation of the UASD – Corredor Duarte tunnel, through a contract with Construtora Odebrecht. The road tunnel has approximately 900 meters of extension, where the internal readings of convergence and repression, as well as mass instrumentations (tassometers and surface landmarks) and the buildings close to...

Saiba mais

Conceptual Design of the Santorini Terminal

We elaborated the conceptual design of the Santorini Terminal, which has an area of approximately 1.2 million square meters, including cellulose terminals, liquids, solid bulkheads, parking space and four mooring berths in the Port of Santos. The designed conveyors that will go to the wharf are of the enclosed...

Saiba mais

Miritituba Hydroval Terminal Basic Project

We developed the complete basic design of the civil, mechanical, electrical and automation disciplines of the Miritituba Terminal, of Hidrovias do Brasil. We also provide support for the hiring and equalization of technical proposals from suppliers of the Miritituba Cargo Transhipment Station located on the banks of the Tapajós...

Saiba mais

LPC Latina and the Cleaning Project of Rio Doce

We were responsible for the basic and executive project of the containment and sediment accumulation dam, coming from the Risoleta Neves HPP reservoir, in the city of Rio Doce, in the state of Minas Gerais. This project comprises a mass of compacted soil and a free-spillway spillway. In the...

Saiba mais
  • Por : Latina18@
  • management
  • Comments Off on BTP Management

BTP Management

BTP (Brazil Terminal Port) is a multipurpose terminal for the handling of containers and liquid bulk, located in the Port of Santos in a projected area of 490 thousand m² and a dock of 1,108 meters. In this project, we work from its conception until delivery, with basic project...

Saiba mais
  • Por : Latina18@
  • management
  • Comments Off on World Cup Wharf Management

World Cup Wharf Management

Through a contract with CODESP (Companhia Docas do Estado de São Paulo), we are working on the management and supervision of the alignment work of the Cais da Copa, also known as Cais de Outerinhos, located in the Port of Santos. The wharf has a total length of 1,283...

Saiba mais

Tiplam management

Our team was contracted by Vale to integrate all the On-shore and Off-Shore Executive Projects of TIPLAM – Port Integrator Terminal Luiz Antonio Mesquita, currently operated by VLI. In addition, we participate in the Executive Planning for the implementation of the works and we also act as ATO (technical...

Saiba mais

Pesquisar